Key Milestones & Experience

PT. Buana Inovasi Persada have consistently partnered with industry leaders to maintain and expand the backbone of Indonesian telecommunications.
  • Submarine Infrastructure Excellence : Successfully completed critical deep-water and coastal submarine cable repairs for major providers like PT. XL Axiata Tbk and PT. PGAS Telekomunikasi Nusantara, including the BRPP 24 CORE line and the Ancol-Mentigi route.
  • Strategic Engineering & HDD : Beyond maintenance, we have specialized in Horizontal Directional Drilling (HDD) and site surveys, providing the technical oversight necessary for complex civil works through PT. Super Sistem Ultima.
  • Supply & Logistics Strength : Our journey is also marked by our capacity to supply specialized equipment, having provided over 50+ units of IJC ™ (INFINITE JOINT CLOSURE) and advanced testing tools (OTDR) to various national projects.

Early year

Year 2015

  • Engineering and supervised project replacement XL- Axiata submarine fiber optic cable from Halim perdana kusuma to Pondok ungu under CCSI.
  • Engineering, jointing and testing submarine fiber optic cable for XL-Axiata under Bina Nusantara perkasa.
  • Engineering and supervised project replacement XL- Axiata submarine fiber optic cable from Labroy vessel to Pondok ungu under CCSI.
  • Pullhead supply for chevron submarine high voltage power cable to Indokarya elektrik mandiri.
  • Design, fabrication and supply for modification wire armoured joint closure for exxon mobile project to Rekayasa Industri.
  • Fiber Optic cable trainer for Bina Nusantara Perkasa under CCSI.
  • Design, fabrication and supply for submarine cable joint closure box to CCSI.
  • Engineering and supervised for jointing, testing and termination for exxon mobile project under CCSI.
  • Agency service for AHTS vessel to CCSI.
  • ENI-Jangkrik project fiber optic cable installation under  Harris Caprock Communicatiion Indonesia.
  • Engineering and costruction for JIBA submarine cable Repair under CCSI.

Year 2016

Next & Beyond

  • Year 2025

    NO PO DATE FROM PROJECT NAME
    1 09/01/25 PT Mora Telematika Indonesia Tbk Joint Closure
    2 21/01/25 PT FEBERCO Cable tracker, tone Injector dll & Man power
    3 03/02/25 PT Jejaring Mitra Persada STS dan STP Kabel Rising 8
    4 23/09/24 PT. Sarana Global Indonesia Joint closure untuk restorasi segmen Agats-Keppri KP 0,5 di Agats
    5 13/02/25 PT Mora Telematika Indonesia Tbk STS dan STP Kabel Rising 8
    6 24/02/25 PT Mora Telematika Indonesia Tbk Jasa Sewa CCTV u/proses shop to ship & ship to port
    7 14/03/25 PT. Sarana Global Indonesia Joint closure untuk restorasi segmen Timika - Dobo KP 3.6 di Timika
    8 14/03/25 PT. Sarana Global Indonesia Joint closure untuk restorasi segmen Timika - Dobo KP 3.1 di Timika
    9 13/05/25 PT Super Sistem Data Shore End design and Engineering
    10 28/05/25 PT XL Axiata SVC | Rectification, cable: Submarine-Bulobulo <> Kawinda Nae Km 19.6 | Contract#16399
    11 21/05/25 PT Telkom Infrastruktur Indonesia Jasa penyimpanan material spare SKKL Lokasi Batam
    12 13/06/25 PT Jejaring Mitra Persada Additional Charge STS & STP Kable R8
    13 10/07/25 PT Mora Telematika Indonesia Tbk Additional work day proj STS & STP
    14 19/07/25 PT XLSMART Telecom Sejahtera Tbk Repair Submarine Cut Amlapura <> Senggigi at KM 8.6
    15 01/08/25 PT Indosat Tbk SMW3 Sry Part and Land Cable Dismantle
    16 29/08/25 PT Infrastruktur Telekomunikasi Indonesia Pengadaan Proteksi Kabel (Cement Bag) SKKL IGG Segmen 2 Dumai Batam
    17 - - Pengadaan Perbaikan SKKL Interisland Batam Seg. 4 Ruas Tanjung Batu – BU DOL 29.07.2025
  • Year 2024

    NO CLIENT NAME PROJECT NAME
    1 PT. Communication cable systems Indonesia Engineering and Supervised XL submarine cable transfer
    2 PT. Communication cable systems Indonesia Engineering and supervised fee BNP submarine cable transfer
    3 PT. Communication cable systems Indonesia Engineering, Jointing and testing Fiber Optic submarine cable by BNP for XL Axiata project
    4 PT. Caprock communication indonesia Power meter and light source supply
    5 PT. Indo Karya Elektrik Mandiri Supply pulling head
    6 PT. Rekayasa Industri Supply Joint closure and wire armoured clamp
    7 PT. Communication cable systems Indonesia Jasa Trainer untuk fiber Optic cable training
    8 PT. Communication cable systems Indonesia Supply Box alumunium
    9 PT. Communication cable systems Indonesia Fee Service for harris caprock In Exon mobile project cepu
    10 PT. Communication cable systems Indonesia Fee Service for harris caprock In Exon mobile project cepu
    11 PT. Communication cable systems Indonesia Fee agence kapal logindo destiny
    12 PT. Caprock Communication Indonesia Instalation fiber optic in ENI project kalimantan
    13 PT. Communication cable systems Indonesia Jasa Engineering dan Construction for Jiba CS
  • Year 2023

    NO CLIENT NAME PROJECT NAME
    1 PT. XL Axiata Tbk Perbaikan sementara (Temporary Joint) Submarine Cable KP 4.4 dari BMH Sungsang
    2 PT. Mega Akses Persada (FIBERSTAR) Perbaikan kabel Submarine KM 4.4 dari Sungsang atau 48.4 dari Muntok
    3 PT. Nautic Marine Salvage Cable Tracker Probe CT1 JW FISHER Rent
    4 PT. Nautic Marine Salvage Additional Tools dan Man power
    5 PT. PERMATA SABUK NUSANTARA Tester - Man Power
    6 PT. PERMATA SABUK NUSANTARA OTDR
    7 PT. MEGA AKSES PERSADA Perbaikan Submarine Cable Palembang (Sungsang) - Sungai Liat (Bangka)
    8 PT. TRIASMITRA MULTINIAGA INTERNASIONAL Accessories MPJC for Restoration KP 16.7
    9 PT. XL Axiata Tbk Repair Cable Submarine-Pasuli & Pasuli Post Burial 1500 m (Kp 4,2 To Kp 5,7) depth 3m
    10 PT. TRIASMITRA MULTINIAGA INTERNASIONAL Multi Purpose Joint Closure (19 set)
    11 PT. KETROSDEN TRIASMITRA Multi Purpose Joint Closure (8 set)
    12 PT. Prisma Daya Energia Cable Finding Tj Pinggir Batam (Jasuka)
    13 PT. Delta Maritim Perkasa Cable Reorientasi Tj Pinggir Batam (Jasuka)
    14 PT. Prisma Daya Energia Cement Bag Installation Tj Pinggir Batam (Jasuka)
    15 PT. Dataku Global Akses Multi Purpose Joint Closure (3 set)
    16 PT. Prisma Daya Energia Cable Finding SKKL IGG BU1a - BU1
    17 PT. Prisma Daya Energia Cable Re-orientasi SKKL IGG BU1a - BU1
    18 PT. Prisma Daya Energia Cement bag Installation SKKL IGG BU1a - BU1
  • Year 2022

    NO CLIENT NAME PROJECT NAME
    1 PT. PGAS Telekomunikasi Nusantara Perbaikan FO Cut Submarine Jalur BRPP 24 CORE
    2 PT. XL Axiata Tbk REPAIR CABLE: SUBMARINE-Sungai Liat at KP 7.3
    3 PT. XL Axiata Tbk REPAIR CABLE: DEEP WATER SUBMARINE-Ancol < > Mentigi at KP 80.1
    4 PT. Super Sistem Data Site Survey HDD Team
    5 PT. Tri Telcon Utama Transportation Car Clg-Cepu-Clg, Engineering Fee, Meal & Accomodation
    6 PT. Putra Mulia Telecommunication Material Rectification Submarine Anyer - Kalianda KM 3.6
    7 PT. Sarana Global Indonesia Rental Cable Tracker Probe CT1 JW FISHER
    8 PT. Sarana Global Indonesia Penambahan hari kerja, kelebihan jam kerja dan sewa harian peralatan
    9 PT. Sarana Global Indonesia Perpanjangan Sewa Cable Tracker Probe CT1 JW FISHER
    10 PT. Putra Mulia Telecommunication Fibertron with additional kit hybrid cable joint closure; OTDR Testing with exfo 42db
    11 PT. PGAS Telekomunikasi Nusantara UCAO Splicer Closure
    12 PT. Sarana Global Indonesia Perpanjangan Sewa Cable Tracker Probe CT1 JW FISHER
    13 PT. PGAS Telekomunikasi Nusantara Multi Purpose Joint Closure (2 set)
    14 PT. Nautic Marine Salvage Multi Purpose Joint Closure (6 set)
    15 PT. Nautic Marine Salvage Tools & equipment for MPJC jointing & man power
    16 PT. PGAS Telekomunikasi Nusantara Closure Laut 96 Core, Upgrade dan recondition MPJC 24 Core untuk RO batam PGNCOM
    17 PT. SUPER SISTEM ULTIMA Pekerjaan sipil, Horizontal directional drilling, penasihat dan supervisor teknik
    18 PT. KETROSDEN TRIASMITRA Multi Purpose Joint Closure (9 set)
    19 PT. TRIASMITRA MULTINIAGA INTERNASIONAL Multi Purpose Joint Closure (35 set)
  • Year 2021

    NO CLIENT NAME PROJECT NAME
    1 CCSI Engineering fee, Project Manager and Project Management Handling for Project SKKL CCSI Jawa Bali
    2 PT. KETROSDEN TRIASMITRA MPJC
    3 PT. TRIASMITRA MULTINIAGA INTERNASIONAL MPJC
    4 CCSI Rent Tools and Equipment for Project XL Axiata Cable Repair Ancol - Mentigi KP 108
    5 PT. SUPER SISTEM ULTIMA Batam Cable End Recondition Near Beach Manhole (BMH)
    6 PT. SUPER SISTEM ULTIMA HDPE Pipe Installation (2x20m Length)
    7 PT. TRIASMITRA MULTINIAGA INTERNASIONAL MPJC
    8 SARANA GLOBAL INDONESIA Pengadaan MPJC
    9 PT. TRIASMITRA MULTINIAGA INTERNASIONAL MPJC
    10 PT. TRIASMITRA MULTINIAGA INTERNASIONAL MPJC
    11 PT. TRIASMITRA MULTINIAGA INTERNASIONAL MPJC
    12 CCSI Consultant Fee Project XL Axiata Ancol Mentigi KP 108; Engineering fee, Project Manager & Project Management Handling Project XL Axiata Ancol Mentigi KP 108
    13 CCSI Splicing table rent, OTDR Rent, Splicer Rent, Tools Rent, Jointer
    14 CCSI Installation dan Testing MPJC
    15 PT. JEJARING MITRA PERSADA MPJC
    16 PT. TRIASMITRA MULTINIAGA INTERNASIONAL MPJC
    17 CCSI Rent tools Project DABN Batam Interisland
    18 CCSI Engineering fee, Project Manager & Project Management Handling for Project DABN Batam Interisland
    19 JNM Tube Heatshrink, Zipper Heatshrink, End Cap, Divot, Heat Gun, Fiber Sleeves
    20 PT. KETROSDEN TRIASMITRA MPJC
    21 PT. SUPER SISTEM ULTIMA OTDR test and Check condition use dummy, OTDR repair & replace adapter & pigtail, Verifikasi test after repair use dummy 3.1km and 50km
    22 PT. DNEX TELCO INDONESIA Cable Tracker Probe CT1 JW Fisher
    23 PT. INDOSAT Tbk JAKASUSI Submarine Cable due to Shunt Fault
    24 PT. TRIASMITRA MULTINIAGA INTERNASIONAL MPJC
    25 PT. TRIASMITRA MULTINIAGA INTERNASIONAL MPJC
    26 CCSI Engineering Fee, Project Manager & Project Management Handling for Project Flexible Joint Puger Bali
    27 PT. TRIASMITRA MULTINIAGA INTERNASIONAL Biaya Sewa Linear Cable Engine (Rent day LCE, Operator cable engine, cable Chute, Stand roll, Project management Fee)
    28 PT. TRIASMITRA MULTINIAGA INTERNASIONAL MPJC
  • Year 2020

    NO PO DATE CLIENT NAME PROJECT NAME
    126-12-19PT. KETROSDEN TRIASMITRAADDITIONAL RENT DAY LINEAR CABLE ENGINE
    214-01-20CCSIMPJC Include Accessories
    317-01-20CCSIMPJC Include Accessories
    428-01-20PT. JEJARING MITRA PERSADAMPJC + Acc
    510-02-20CCSITools and Equipment Rent For Project SKKL CCSI Jawa - Bali
    619-02-20PT. JEJARING MITRA PERSADAMPJC
    725-02-20CCSIEngineering fee, Project Manager and Project Management Handling for BU-Insertion and OSP XL Axiata (Ancol-Tanjung Pakis-Mentigi)
    805-03-20CCSIEngineering fee, Project Manager and Project Management Handling for Project Tarempa Testing, Shore End Restoration and Standby Vessel
    909-03-20PT. JEJARING MITRA PERSADAMPJC
    1011-03-20CCSIMarking MPJC
    1117-03-20CCSIMPJC Include Accessories
    1217-03-20CCSIMulti Purpose Joint Closure (MPJC) For All Submarine Single and Double Armored Cable Type MPJC01 (for cable diameter up to 36 mm)
    1320-03-20CCSISURVEY AND COORDINATION FEE PROJECT XL ANCOL - MENTIGI KP 13.5
    1420-03-20CCSIEngineering fee, Project Manager and Project Management Handling for Project XL Ancol Mentigi KP 13.5
    1531-03-20PT. KETROSDEN TRIASMITRAMPJC
    1604-05-20CCSIMan-power, Tools and Equipment for Marine survey Ancol Mentigi KP 56,7 (Near BU Cable Fault)
    1704-05-20CCSITools and Equipment rent for Repair Ancol Mentigi KP 56.7
    1806-05-20PT. KETROSDEN TRIASMITRAMPJC
    1901-06-20PT. KETROSDEN TRIASMITRAMPJC
    2009-06-20CCSIMPJC Include Accessories
    2111-06-20PT. TRIASMITRA MULTINIAGA INT.MPJC
    2201-07-20PT. TRIASMITRA MULTINIAGA INT.MPJC
    2301-07-20CCSIRENT LINEAR CABLE ENGINE
    2413-07-20CCSIADDITIONAL RENT LINEAR CABLE ENGINE
    2511-06-20CCSISINKER
    2611-07-20CCSIADDITIONAL RENT CABLE ROLL CONVEYOR, CABLE TANK AND CABLE CHUTE (7 DAYS); ADDITIONAL RENT QUADRANT AND STAND ROLLER 2 SET (4 DAYS)
    2712-08-20SARANA GLOBAL INDONESIAFLEXIBLE JOINT SA/DA
    2812-08-20SARANA GLOBAL INDONESIATOOLS & EQUIPMENT FOR FLEXIBLE JOINTING & TESTING; MAN POWER
    2925-08-20SARANA GLOBAL INDONESIAFLEXIBLE JOINT SA/DA
    3020-06-20CCSITools and Equipment Rent Project SKKL CCSI Jawa - Bali
    3128-09-20CCSIKOMISI PENJUALAN MPJC
    3230-09-20PT. TRIASMITRA MULTINIAGA INT.MPJC
    3323-09-20CCSIEngineering fee, Project Manager and Project Management Handling for Project Repair XL Axiata Ancol - Mentigi KP 56.7
    3406-10-20CCSIRepair MPJC
    3507-10-20CCSIEngineering fee, Project Manager and Project Management Handling for Project Marine Survey XL Axiata Ancol Mentigi KP 56.7
    3612-10-20PT. TRIASMITRA MULTINIAGA INT.MPJC
    3709-10-20CCSISurvey and Coordination Fee Project Repair XL Axiata Ancol - Mentigi Kp. 56.7
    3813-10-20CCSIRepacking and Labeling MPJC
    3927-10-20PT. TRIASMITRA MULTINIAGA INT.MPJC
    4002-11-20CCSIRepair MPJC
    4104-11-20PT. KETROSDEN TRIASMITRAMPJC
    4210-11-20CCSIUpgrade, Drawing, and Fabrication new design MPJC
    4324-11-20PT. BUANA INOVASI TELEKOMUNIKASIMPJC
    4426-11-20CCSIRe-packing and labeling MPJC
    4504-12-20CCSIRental Tools and Equipment for Project Tarempa
    4610-12-20PT. KETROSDEN TRIASMITRAMPJC
    4714-12-20CCSINew Design MPJC
    4810-12-20PT. TRIASMITRA MULTINIAGA INT.MPJC
    4921-12-20CCSISubmarine & Bathymetry Survey
    5021-12-20CCSICable Spare Handling
    5121-12-20CCSIRent Cable Engine, Cable Tank, Cable Roll Conveyor, Cable Chute and Cable Stand Roll
    5221-12-20CCSIEngineering fee, Project Manager and Project Management Handling for Project Tarempa
    5321-12-20CCSIInstallation and testing new design MPJC
    5421-12-20CCSIRecondition MPJC to New Design
  • Year 2019

    NO CLIENT NAME PROJECT NAME
    1CCSI1. MAIN JOINT CLOSURE MPJC
    2. AKSESORIS MPJC AND PACKING
    2SARANA GLOBAL INDONESIAMPJC JOINT CLOSURE KIT
    3KETROSDEN TRIASMITRAMPJC
    4JEJARING MITRA PERSADAMPJC
    5KETROSDEN TRIASMITRAMPJC
    6CCSITOOLS AND EQUIPMENT RENT FOR BENCULUK KALIASEM CABLE REPAIR
    7CCSITOOLS AND EQUIPMENT RENT FOR BNP TARAKAN
    8CCSITOOLS AND EQUIPMENT RENT FOR BATAM KARIMUN
    9CCSIMPJC INCLUDES ACCESSORIES
    10TRIASMITRA MULTINIAGA INTERNASIONALMPJC
    11CCSIMPJC INCLUDES ACCESSORIES
    12CCSIAKSESORIS MPJC
    13JEJARING MITRA PERSADAMPJC JOINT CLOSURE KIT
    14CCSIENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR TELKOMINFRA LOMBOK
    15CCSIENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR NATUNA PROJECT
    16CCSIENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR XL AXIATA RELOCATION BMH SENGIGI LOMBOK
    17CCSIENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR BNP TARAKAN
    19JEJARING MITRA PERSADAMPJC REVERSE ROPA
    20PT. KETROSDEN TRIASMITRAMPJC FOR PASULI
    21CCSIMPJC INCLUDES ACCESSORIES
    22CCSITOOLS AND EQUIPMENT RENT FOR DAB IKK TARJUN-STAGEN SUBMARINE CABLE JOINT
    23PT. TRIASMITRA MULTINIAGA INTERNASIONALMULTI PURPOSE JOINT CLOSURE
    24SARANA GLOBAL INDONESIACABLE FINDING SUPERVISOR
    25CCSIMPJC 01 COMPLETED FOR CABLE DIAMETER UP TO 36MM
    26CCSIENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR TELKOM SKKL BENCULUK-JIMBARAN
    27CCSISURVEY AND COORDINATION FEE FOR TELKOM BENCULUK-JIMBARAN
    28CCSIENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR XL REBURIAL TOWALE PALU
    29CCSIMPJC JOINT KIT SET
    30PT. KETROSDEN TRIASMITRAMULTI PURPOSE JOINT CLOSURE
    31PT. KETROSDEN TRIASMITRAMPJC
    32PT. TRIASMITRA MULTINIAGA INTERNASIONALSPARE ACCESSORIES MPJC
    33PT. KETROSDEN TRIASMITRAMPJC
    34PT. TRIASMITRA MULTINIAGA INTERNASIONALMPJC
    35PT. TRIASMITRA MULTINIAGA INTERNASIONALMPJC
    36CCSIMPJC JOINT KIT SET
    37CCSIENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR ASBL BATAM - TANJUNG BALAI KARIMUN CABLE REPAIR
    38CCSISURVEY AND COORDINATION FEE FOR BATAM - KARIMUN CABLE REPAIR
    39PT. TRIASMITRA MULTINIAGA INTERNASIONALADDITIONAL PART MPJC JOINT CLOSURE KIT
    40AMPLE SPIRIT SDN BHDMAN POWER FOR 15 WORKDAY, PASSPORT FOR 7 PERSON, TRANSPORT TO AIRPORT INDONESIA FOR 18 PERSON, PUMP, ENGINE AND ASSEMBLY
    41CCSIMPJC INCLUDE ACCESSORIES
    42PT. KETROSDEN TRIASMITRARENT LINEAR CABLE ENGINE
    43CCSISURVEY AND COORDINATION FEE PROJECT XL SUNGAI LIAT BANGKA
    44CCSITOOLS AND EQUIPMENT RENT FOR PROJECT XL SUNGAI LIAT BANGKA
    45CCSIENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR DAB IKKTARJUN - STAGEN
    46CCSIENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR PROJECT XL SUNGAI LIAT BANGKA
    47CCSIJOINTING AND TESTING EQUIPMENT RENT FOR PROJECT XL ANCOL MENTIGI, MODIFIKASI CABLE ENGINE, BURIAL SETTING EQUIPMENT, CABLE CUTTER, DIVING EQUIPMENT
    48PT. KETROSDEN TRIASMITRAADDITIONAL RENT DAY LINEAR CABLE ENGINE, LCE INSURANCE
    49PT. KETROSDEN TRIASMITRAADDITIONAL RENT DAY LINEAR CABLE ENGINE
    50PT. KETROSDEN TRIASMITRAANCHOR FLANGE
    51PT. KETROSDEN TRIASMITRAADDITIONAL RENT DAY LINEAR CABLE ENGINE
  • Year 2018

    NO CLIENT NAME PROJECT NAME
    1SARANA GLOBAL INDONESIAMPJC JOINT CLOSURE KIT
    2CCSI1. Ex-Training MPJC Indosat main MPJC Repair
    2. Additional consumable
    3CCSIRepair cable laut XL axiata, Main MPJC repair
    4CCSITraining konsultan MPJC
    5CCSITrainer fee and engineering fee for MPJC
    6CCSIMPJC, AKSESORIS MPJC
    7CCSI1. SURVEY AND COORDINATION FOR XL AXIATA SUBMARINE CABLE REPAIR
    2. TOOLS AND EQUIPMENT RENT FOR XL AXIATA SUBMARINE CABLE REPAIR
    8CCSIMPJC MODIFICATION
    9CCSIENGINEERING FEE, PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING
    10CCSI1. SURVEY AND COORDINATION FEE
    2. EQUIPMENT AND TOOLS RENT
    11CCSI1. MAIN JOINT CLOSURE MPJC
    2. AKSESORIS MPJC DAN PACKING
    12JEJARING MITRA PERSADACABLE ANCHOR FLANGE
    13SARANA GLOBAL INDONESIAMPJC JOINT CLOSURE KIT
    14CCSICOMPRESSOR BAEUR PASEIDON PE-100 E 3 PHASE 225 BAR, PENGGERAK HONDA GX160 + PULLEY
    15CCSI1. COORDINATION FEE
    2. ENGINEERING FEE, PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING
    16LIMIN MARINE AND OFFSHORE1. CABLE ROLLER PORTABLE
    2. OTDR EXFO
    17LIMIN MARINE AND OFFSHOREPERFORMED STOPER SIZE 10 MM LENGTH 1,5 mm
    PERFORMED STOPER SIZE 10 MM LENGTH 2,0 mm
    18CCSIENGINEERING FEE, PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING
    19CCSIENGINEERING FEE, PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING, SEWA OTDR
    20CCSI1. RENTAL TOOLS AND EQUIPMENT FOR TAREMPA JOINTING
    2. RENTAL TOOLS AND EQUIPMENT FOR TAREMPA TESTING
    21CCSI1. MAIN JOINT CLOSURE MPJC
    2. AKSESORIS MPJC AND PACKING
    22CCSITOOLKIT SET FOR MPJC
    23CCSI1. SURVEY AND COORDINATION
    2. RENTAL TOOLS AND EQUIPMENT (BMH RELOKASI XL)
    24CCSIENGINEERING FEE, PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING (BMH RELOKASI XL)
    25CCSIRENTAL TOOLS AND EQUIPMENT FOR TESTING AND JOINTING TELKOMINFRA
    26CCSISURVEY AND COORDINATION FOR TELKOMINFRA
    27CCSIRENTAL TOOLS AND EQUIPMENT FOR TESTING AND JOINTING NATUNA
  • Year 2017

    NO CLIENT NAME PROJECT NAME
    1 PT. Communication cable systems Indonesia Engineering and Supervised XL submarine cable transfer
    2 PT. Communication cable systems Indonesia Engineering and supervised fee BNP submarine cable transfer
    3 PT. Communication cable systems Indonesia Engineering, Jointing and testing Fiber Optic submarine cable by BNP for XL Axiata project
    4 PT. Caprock communication indonesia Power meter and light source supply
    5 PT. Indo Karya Elektrik Mandiri Supply pulling head
    6 PT. Rekayasa Industri Supply Joint closure and wire armoured clamp
    7 PT. Communication cable systems Indonesia Jasa Trainer untuk fiber Optic cable training
    8 PT. Communication cable systems Indonesia Supply Box alumunium
    9 PT. Communication cable systems Indonesia Fee Service for harris caprock In Exon mobile project cepu
    10 PT. Communication cable systems Indonesia Fee Service for harris caprock In Exon mobile project cepu
    11 PT. Communication cable systems Indonesia Fee agence kapal logindo destiny
    12 PT. Caprock Communication Indonesia Instalation fiber optic in ENI project kalimantan
    13 PT. Communication cable systems Indonesia Jasa Engineering dan Construction for Jiba CS

Contact us for more information