- You are here:
- Home >
- Company Experience
Supply & Logistics Strength : Our journey is also marked by our capacity to supply specialized equipment, having provided over 50+ units of IJC ™ (INFINITE JOINT CLOSURE) and advanced testing tools (OTDR) to various national projects.
| NO | PO DATE | FROM | PROJECT NAME |
|---|---|---|---|
| 1 | 09/01/25 | PT Mora Telematika Indonesia Tbk | Joint Closure |
| 2 | 21/01/25 | PT FEBERCO | Cable tracker, tone Injector dll & Man power |
| 3 | 03/02/25 | PT Jejaring Mitra Persada | STS dan STP Kabel Rising 8 |
| 4 | 23/09/24 | PT. Sarana Global Indonesia | Joint closure untuk restorasi segmen Agats-Keppri KP 0,5 di Agats |
| 5 | 13/02/25 | PT Mora Telematika Indonesia Tbk | STS dan STP Kabel Rising 8 |
| 6 | 24/02/25 | PT Mora Telematika Indonesia Tbk | Jasa Sewa CCTV u/proses shop to ship & ship to port |
| 7 | 14/03/25 | PT. Sarana Global Indonesia | Joint closure untuk restorasi segmen Timika - Dobo KP 3.6 di Timika |
| 8 | 14/03/25 | PT. Sarana Global Indonesia | Joint closure untuk restorasi segmen Timika - Dobo KP 3.1 di Timika |
| 9 | 13/05/25 | PT Super Sistem Data | Shore End design and Engineering |
| 10 | 28/05/25 | PT XL Axiata | SVC | Rectification, cable: Submarine-Bulobulo <> Kawinda Nae Km 19.6 | Contract#16399 |
| 11 | 21/05/25 | PT Telkom Infrastruktur Indonesia | Jasa penyimpanan material spare SKKL Lokasi Batam |
| 12 | 13/06/25 | PT Jejaring Mitra Persada | Additional Charge STS & STP Kable R8 |
| 13 | 10/07/25 | PT Mora Telematika Indonesia Tbk | Additional work day proj STS & STP |
| 14 | 19/07/25 | PT XLSMART Telecom Sejahtera Tbk | Repair Submarine Cut Amlapura <> Senggigi at KM 8.6 |
| 15 | 01/08/25 | PT Indosat Tbk | SMW3 Sry Part and Land Cable Dismantle |
| 16 | 29/08/25 | PT Infrastruktur Telekomunikasi Indonesia | Pengadaan Proteksi Kabel (Cement Bag) SKKL IGG Segmen 2 Dumai Batam |
| 17 | - | - | Pengadaan Perbaikan SKKL Interisland Batam Seg. 4 Ruas Tanjung Batu – BU DOL 29.07.2025 |
| NO | CLIENT NAME | PROJECT NAME |
|---|---|---|
| 1 | PT. Communication cable systems Indonesia | Engineering and Supervised XL submarine cable transfer |
| 2 | PT. Communication cable systems Indonesia | Engineering and supervised fee BNP submarine cable transfer |
| 3 | PT. Communication cable systems Indonesia | Engineering, Jointing and testing Fiber Optic submarine cable by BNP for XL Axiata project |
| 4 | PT. Caprock communication indonesia | Power meter and light source supply |
| 5 | PT. Indo Karya Elektrik Mandiri | Supply pulling head |
| 6 | PT. Rekayasa Industri | Supply Joint closure and wire armoured clamp |
| 7 | PT. Communication cable systems Indonesia | Jasa Trainer untuk fiber Optic cable training |
| 8 | PT. Communication cable systems Indonesia | Supply Box alumunium |
| 9 | PT. Communication cable systems Indonesia | Fee Service for harris caprock In Exon mobile project cepu |
| 10 | PT. Communication cable systems Indonesia | Fee Service for harris caprock In Exon mobile project cepu |
| 11 | PT. Communication cable systems Indonesia | Fee agence kapal logindo destiny |
| 12 | PT. Caprock Communication Indonesia | Instalation fiber optic in ENI project kalimantan |
| 13 | PT. Communication cable systems Indonesia | Jasa Engineering dan Construction for Jiba CS |
| NO | CLIENT NAME | PROJECT NAME |
|---|---|---|
| 1 | PT. XL Axiata Tbk | Perbaikan sementara (Temporary Joint) Submarine Cable KP 4.4 dari BMH Sungsang |
| 2 | PT. Mega Akses Persada (FIBERSTAR) | Perbaikan kabel Submarine KM 4.4 dari Sungsang atau 48.4 dari Muntok |
| 3 | PT. Nautic Marine Salvage | Cable Tracker Probe CT1 JW FISHER Rent |
| 4 | PT. Nautic Marine Salvage | Additional Tools dan Man power |
| 5 | PT. PERMATA SABUK NUSANTARA | Tester - Man Power |
| 6 | PT. PERMATA SABUK NUSANTARA | OTDR |
| 7 | PT. MEGA AKSES PERSADA | Perbaikan Submarine Cable Palembang (Sungsang) - Sungai Liat (Bangka) |
| 8 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | Accessories MPJC for Restoration KP 16.7 |
| 9 | PT. XL Axiata Tbk | Repair Cable Submarine-Pasuli & Pasuli Post Burial 1500 m (Kp 4,2 To Kp 5,7) depth 3m |
| 10 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | Multi Purpose Joint Closure (19 set) |
| 11 | PT. KETROSDEN TRIASMITRA | Multi Purpose Joint Closure (8 set) |
| 12 | PT. Prisma Daya Energia | Cable Finding Tj Pinggir Batam (Jasuka) |
| 13 | PT. Delta Maritim Perkasa | Cable Reorientasi Tj Pinggir Batam (Jasuka) |
| 14 | PT. Prisma Daya Energia | Cement Bag Installation Tj Pinggir Batam (Jasuka) |
| 15 | PT. Dataku Global Akses | Multi Purpose Joint Closure (3 set) |
| 16 | PT. Prisma Daya Energia | Cable Finding SKKL IGG BU1a - BU1 |
| 17 | PT. Prisma Daya Energia | Cable Re-orientasi SKKL IGG BU1a - BU1 |
| 18 | PT. Prisma Daya Energia | Cement bag Installation SKKL IGG BU1a - BU1 |
| NO | CLIENT NAME | PROJECT NAME |
|---|---|---|
| 1 | PT. PGAS Telekomunikasi Nusantara | Perbaikan FO Cut Submarine Jalur BRPP 24 CORE |
| 2 | PT. XL Axiata Tbk | REPAIR CABLE: SUBMARINE-Sungai Liat at KP 7.3 |
| 3 | PT. XL Axiata Tbk | REPAIR CABLE: DEEP WATER SUBMARINE-Ancol < > Mentigi at KP 80.1 |
| 4 | PT. Super Sistem Data | Site Survey HDD Team |
| 5 | PT. Tri Telcon Utama | Transportation Car Clg-Cepu-Clg, Engineering Fee, Meal & Accomodation |
| 6 | PT. Putra Mulia Telecommunication | Material Rectification Submarine Anyer - Kalianda KM 3.6 |
| 7 | PT. Sarana Global Indonesia | Rental Cable Tracker Probe CT1 JW FISHER |
| 8 | PT. Sarana Global Indonesia | Penambahan hari kerja, kelebihan jam kerja dan sewa harian peralatan |
| 9 | PT. Sarana Global Indonesia | Perpanjangan Sewa Cable Tracker Probe CT1 JW FISHER |
| 10 | PT. Putra Mulia Telecommunication | Fibertron with additional kit hybrid cable joint closure; OTDR Testing with exfo 42db |
| 11 | PT. PGAS Telekomunikasi Nusantara | UCAO Splicer Closure |
| 12 | PT. Sarana Global Indonesia | Perpanjangan Sewa Cable Tracker Probe CT1 JW FISHER |
| 13 | PT. PGAS Telekomunikasi Nusantara | Multi Purpose Joint Closure (2 set) |
| 14 | PT. Nautic Marine Salvage | Multi Purpose Joint Closure (6 set) |
| 15 | PT. Nautic Marine Salvage | Tools & equipment for MPJC jointing & man power |
| 16 | PT. PGAS Telekomunikasi Nusantara | Closure Laut 96 Core, Upgrade dan recondition MPJC 24 Core untuk RO batam PGNCOM |
| 17 | PT. SUPER SISTEM ULTIMA | Pekerjaan sipil, Horizontal directional drilling, penasihat dan supervisor teknik |
| 18 | PT. KETROSDEN TRIASMITRA | Multi Purpose Joint Closure (9 set) |
| 19 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | Multi Purpose Joint Closure (35 set) |
| NO | CLIENT NAME | PROJECT NAME |
|---|---|---|
| 1 | CCSI | Engineering fee, Project Manager and Project Management Handling for Project SKKL CCSI Jawa Bali |
| 2 | PT. KETROSDEN TRIASMITRA | MPJC |
| 3 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | MPJC |
| 4 | CCSI | Rent Tools and Equipment for Project XL Axiata Cable Repair Ancol - Mentigi KP 108 |
| 5 | PT. SUPER SISTEM ULTIMA | Batam Cable End Recondition Near Beach Manhole (BMH) |
| 6 | PT. SUPER SISTEM ULTIMA | HDPE Pipe Installation (2x20m Length) |
| 7 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | MPJC |
| 8 | SARANA GLOBAL INDONESIA | Pengadaan MPJC |
| 9 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | MPJC |
| 10 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | MPJC |
| 11 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | MPJC |
| 12 | CCSI | Consultant Fee Project XL Axiata Ancol Mentigi KP 108; Engineering fee, Project Manager & Project Management Handling Project XL Axiata Ancol Mentigi KP 108 |
| 13 | CCSI | Splicing table rent, OTDR Rent, Splicer Rent, Tools Rent, Jointer |
| 14 | CCSI | Installation dan Testing MPJC |
| 15 | PT. JEJARING MITRA PERSADA | MPJC |
| 16 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | MPJC |
| 17 | CCSI | Rent tools Project DABN Batam Interisland |
| 18 | CCSI | Engineering fee, Project Manager & Project Management Handling for Project DABN Batam Interisland |
| 19 | JNM | Tube Heatshrink, Zipper Heatshrink, End Cap, Divot, Heat Gun, Fiber Sleeves |
| 20 | PT. KETROSDEN TRIASMITRA | MPJC |
| 21 | PT. SUPER SISTEM ULTIMA | OTDR test and Check condition use dummy, OTDR repair & replace adapter & pigtail, Verifikasi test after repair use dummy 3.1km and 50km |
| 22 | PT. DNEX TELCO INDONESIA | Cable Tracker Probe CT1 JW Fisher |
| 23 | PT. INDOSAT Tbk | JAKASUSI Submarine Cable due to Shunt Fault |
| 24 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | MPJC |
| 25 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | MPJC |
| 26 | CCSI | Engineering Fee, Project Manager & Project Management Handling for Project Flexible Joint Puger Bali |
| 27 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | Biaya Sewa Linear Cable Engine (Rent day LCE, Operator cable engine, cable Chute, Stand roll, Project management Fee) |
| 28 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | MPJC |
| NO | PO DATE | CLIENT NAME | PROJECT NAME |
|---|---|---|---|
| 1 | 26-12-19 | PT. KETROSDEN TRIASMITRA | ADDITIONAL RENT DAY LINEAR CABLE ENGINE |
| 2 | 14-01-20 | CCSI | MPJC Include Accessories |
| 3 | 17-01-20 | CCSI | MPJC Include Accessories |
| 4 | 28-01-20 | PT. JEJARING MITRA PERSADA | MPJC + Acc |
| 5 | 10-02-20 | CCSI | Tools and Equipment Rent For Project SKKL CCSI Jawa - Bali |
| 6 | 19-02-20 | PT. JEJARING MITRA PERSADA | MPJC |
| 7 | 25-02-20 | CCSI | Engineering fee, Project Manager and Project Management Handling for BU-Insertion and OSP XL Axiata (Ancol-Tanjung Pakis-Mentigi) |
| 8 | 05-03-20 | CCSI | Engineering fee, Project Manager and Project Management Handling for Project Tarempa Testing, Shore End Restoration and Standby Vessel |
| 9 | 09-03-20 | PT. JEJARING MITRA PERSADA | MPJC |
| 10 | 11-03-20 | CCSI | Marking MPJC |
| 11 | 17-03-20 | CCSI | MPJC Include Accessories |
| 12 | 17-03-20 | CCSI | Multi Purpose Joint Closure (MPJC) For All Submarine Single and Double Armored Cable Type MPJC01 (for cable diameter up to 36 mm) |
| 13 | 20-03-20 | CCSI | SURVEY AND COORDINATION FEE PROJECT XL ANCOL - MENTIGI KP 13.5 |
| 14 | 20-03-20 | CCSI | Engineering fee, Project Manager and Project Management Handling for Project XL Ancol Mentigi KP 13.5 |
| 15 | 31-03-20 | PT. KETROSDEN TRIASMITRA | MPJC |
| 16 | 04-05-20 | CCSI | Man-power, Tools and Equipment for Marine survey Ancol Mentigi KP 56,7 (Near BU Cable Fault) |
| 17 | 04-05-20 | CCSI | Tools and Equipment rent for Repair Ancol Mentigi KP 56.7 |
| 18 | 06-05-20 | PT. KETROSDEN TRIASMITRA | MPJC |
| 19 | 01-06-20 | PT. KETROSDEN TRIASMITRA | MPJC |
| 20 | 09-06-20 | CCSI | MPJC Include Accessories |
| 21 | 11-06-20 | PT. TRIASMITRA MULTINIAGA INT. | MPJC |
| 22 | 01-07-20 | PT. TRIASMITRA MULTINIAGA INT. | MPJC |
| 23 | 01-07-20 | CCSI | RENT LINEAR CABLE ENGINE |
| 24 | 13-07-20 | CCSI | ADDITIONAL RENT LINEAR CABLE ENGINE |
| 25 | 11-06-20 | CCSI | SINKER |
| 26 | 11-07-20 | CCSI | ADDITIONAL RENT CABLE ROLL CONVEYOR, CABLE TANK AND CABLE CHUTE (7 DAYS); ADDITIONAL RENT QUADRANT AND STAND ROLLER 2 SET (4 DAYS) |
| 27 | 12-08-20 | SARANA GLOBAL INDONESIA | FLEXIBLE JOINT SA/DA |
| 28 | 12-08-20 | SARANA GLOBAL INDONESIA | TOOLS & EQUIPMENT FOR FLEXIBLE JOINTING & TESTING; MAN POWER |
| 29 | 25-08-20 | SARANA GLOBAL INDONESIA | FLEXIBLE JOINT SA/DA |
| 30 | 20-06-20 | CCSI | Tools and Equipment Rent Project SKKL CCSI Jawa - Bali |
| 31 | 28-09-20 | CCSI | KOMISI PENJUALAN MPJC |
| 32 | 30-09-20 | PT. TRIASMITRA MULTINIAGA INT. | MPJC |
| 33 | 23-09-20 | CCSI | Engineering fee, Project Manager and Project Management Handling for Project Repair XL Axiata Ancol - Mentigi KP 56.7 |
| 34 | 06-10-20 | CCSI | Repair MPJC |
| 35 | 07-10-20 | CCSI | Engineering fee, Project Manager and Project Management Handling for Project Marine Survey XL Axiata Ancol Mentigi KP 56.7 |
| 36 | 12-10-20 | PT. TRIASMITRA MULTINIAGA INT. | MPJC |
| 37 | 09-10-20 | CCSI | Survey and Coordination Fee Project Repair XL Axiata Ancol - Mentigi Kp. 56.7 |
| 38 | 13-10-20 | CCSI | Repacking and Labeling MPJC |
| 39 | 27-10-20 | PT. TRIASMITRA MULTINIAGA INT. | MPJC |
| 40 | 02-11-20 | CCSI | Repair MPJC |
| 41 | 04-11-20 | PT. KETROSDEN TRIASMITRA | MPJC |
| 42 | 10-11-20 | CCSI | Upgrade, Drawing, and Fabrication new design MPJC |
| 43 | 24-11-20 | PT. BUANA INOVASI TELEKOMUNIKASI | MPJC |
| 44 | 26-11-20 | CCSI | Re-packing and labeling MPJC |
| 45 | 04-12-20 | CCSI | Rental Tools and Equipment for Project Tarempa |
| 46 | 10-12-20 | PT. KETROSDEN TRIASMITRA | MPJC |
| 47 | 14-12-20 | CCSI | New Design MPJC |
| 48 | 10-12-20 | PT. TRIASMITRA MULTINIAGA INT. | MPJC |
| 49 | 21-12-20 | CCSI | Submarine & Bathymetry Survey |
| 50 | 21-12-20 | CCSI | Cable Spare Handling |
| 51 | 21-12-20 | CCSI | Rent Cable Engine, Cable Tank, Cable Roll Conveyor, Cable Chute and Cable Stand Roll |
| 52 | 21-12-20 | CCSI | Engineering fee, Project Manager and Project Management Handling for Project Tarempa |
| 53 | 21-12-20 | CCSI | Installation and testing new design MPJC |
| 54 | 21-12-20 | CCSI | Recondition MPJC to New Design |
| NO | CLIENT NAME | PROJECT NAME |
|---|---|---|
| 1 | CCSI | 1. MAIN JOINT CLOSURE MPJC 2. AKSESORIS MPJC AND PACKING |
| 2 | SARANA GLOBAL INDONESIA | MPJC JOINT CLOSURE KIT |
| 3 | KETROSDEN TRIASMITRA | MPJC |
| 4 | JEJARING MITRA PERSADA | MPJC |
| 5 | KETROSDEN TRIASMITRA | MPJC |
| 6 | CCSI | TOOLS AND EQUIPMENT RENT FOR BENCULUK KALIASEM CABLE REPAIR |
| 7 | CCSI | TOOLS AND EQUIPMENT RENT FOR BNP TARAKAN |
| 8 | CCSI | TOOLS AND EQUIPMENT RENT FOR BATAM KARIMUN |
| 9 | CCSI | MPJC INCLUDES ACCESSORIES |
| 10 | TRIASMITRA MULTINIAGA INTERNASIONAL | MPJC |
| 11 | CCSI | MPJC INCLUDES ACCESSORIES |
| 12 | CCSI | AKSESORIS MPJC |
| 13 | JEJARING MITRA PERSADA | MPJC JOINT CLOSURE KIT |
| 14 | CCSI | ENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR TELKOMINFRA LOMBOK |
| 15 | CCSI | ENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR NATUNA PROJECT |
| 16 | CCSI | ENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR XL AXIATA RELOCATION BMH SENGIGI LOMBOK |
| 17 | CCSI | ENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR BNP TARAKAN |
| 19 | JEJARING MITRA PERSADA | MPJC REVERSE ROPA |
| 20 | PT. KETROSDEN TRIASMITRA | MPJC FOR PASULI |
| 21 | CCSI | MPJC INCLUDES ACCESSORIES |
| 22 | CCSI | TOOLS AND EQUIPMENT RENT FOR DAB IKK TARJUN-STAGEN SUBMARINE CABLE JOINT |
| 23 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | MULTI PURPOSE JOINT CLOSURE |
| 24 | SARANA GLOBAL INDONESIA | CABLE FINDING SUPERVISOR |
| 25 | CCSI | MPJC 01 COMPLETED FOR CABLE DIAMETER UP TO 36MM |
| 26 | CCSI | ENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR TELKOM SKKL BENCULUK-JIMBARAN |
| 27 | CCSI | SURVEY AND COORDINATION FEE FOR TELKOM BENCULUK-JIMBARAN |
| 28 | CCSI | ENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR XL REBURIAL TOWALE PALU |
| 29 | CCSI | MPJC JOINT KIT SET |
| 30 | PT. KETROSDEN TRIASMITRA | MULTI PURPOSE JOINT CLOSURE |
| 31 | PT. KETROSDEN TRIASMITRA | MPJC |
| 32 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | SPARE ACCESSORIES MPJC |
| 33 | PT. KETROSDEN TRIASMITRA | MPJC |
| 34 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | MPJC |
| 35 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | MPJC |
| 36 | CCSI | MPJC JOINT KIT SET |
| 37 | CCSI | ENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR ASBL BATAM - TANJUNG BALAI KARIMUN CABLE REPAIR |
| 38 | CCSI | SURVEY AND COORDINATION FEE FOR BATAM - KARIMUN CABLE REPAIR |
| 39 | PT. TRIASMITRA MULTINIAGA INTERNASIONAL | ADDITIONAL PART MPJC JOINT CLOSURE KIT |
| 40 | AMPLE SPIRIT SDN BHD | MAN POWER FOR 15 WORKDAY, PASSPORT FOR 7 PERSON, TRANSPORT TO AIRPORT INDONESIA FOR 18 PERSON, PUMP, ENGINE AND ASSEMBLY |
| 41 | CCSI | MPJC INCLUDE ACCESSORIES |
| 42 | PT. KETROSDEN TRIASMITRA | RENT LINEAR CABLE ENGINE |
| 43 | CCSI | SURVEY AND COORDINATION FEE PROJECT XL SUNGAI LIAT BANGKA |
| 44 | CCSI | TOOLS AND EQUIPMENT RENT FOR PROJECT XL SUNGAI LIAT BANGKA |
| 45 | CCSI | ENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR DAB IKKTARJUN - STAGEN |
| 46 | CCSI | ENGINEERING FEE PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING FOR PROJECT XL SUNGAI LIAT BANGKA |
| 47 | CCSI | JOINTING AND TESTING EQUIPMENT RENT FOR PROJECT XL ANCOL MENTIGI, MODIFIKASI CABLE ENGINE, BURIAL SETTING EQUIPMENT, CABLE CUTTER, DIVING EQUIPMENT |
| 48 | PT. KETROSDEN TRIASMITRA | ADDITIONAL RENT DAY LINEAR CABLE ENGINE, LCE INSURANCE |
| 49 | PT. KETROSDEN TRIASMITRA | ADDITIONAL RENT DAY LINEAR CABLE ENGINE |
| 50 | PT. KETROSDEN TRIASMITRA | ANCHOR FLANGE |
| 51 | PT. KETROSDEN TRIASMITRA | ADDITIONAL RENT DAY LINEAR CABLE ENGINE |
| NO | CLIENT NAME | PROJECT NAME |
|---|---|---|
| 1 | SARANA GLOBAL INDONESIA | MPJC JOINT CLOSURE KIT |
| 2 | CCSI | 1. Ex-Training MPJC Indosat main MPJC Repair 2. Additional consumable |
| 3 | CCSI | Repair cable laut XL axiata, Main MPJC repair |
| 4 | CCSI | Training konsultan MPJC |
| 5 | CCSI | Trainer fee and engineering fee for MPJC |
| 6 | CCSI | MPJC, AKSESORIS MPJC |
| 7 | CCSI | 1. SURVEY AND COORDINATION FOR XL AXIATA SUBMARINE CABLE REPAIR 2. TOOLS AND EQUIPMENT RENT FOR XL AXIATA SUBMARINE CABLE REPAIR |
| 8 | CCSI | MPJC MODIFICATION |
| 9 | CCSI | ENGINEERING FEE, PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING |
| 10 | CCSI | 1. SURVEY AND COORDINATION FEE 2. EQUIPMENT AND TOOLS RENT |
| 11 | CCSI | 1. MAIN JOINT CLOSURE MPJC 2. AKSESORIS MPJC DAN PACKING |
| 12 | JEJARING MITRA PERSADA | CABLE ANCHOR FLANGE |
| 13 | SARANA GLOBAL INDONESIA | MPJC JOINT CLOSURE KIT |
| 14 | CCSI | COMPRESSOR BAEUR PASEIDON PE-100 E 3 PHASE 225 BAR, PENGGERAK HONDA GX160 + PULLEY |
| 15 | CCSI | 1. COORDINATION FEE 2. ENGINEERING FEE, PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING |
| 16 | LIMIN MARINE AND OFFSHORE | 1. CABLE ROLLER PORTABLE 2. OTDR EXFO |
| 17 | LIMIN MARINE AND OFFSHORE | PERFORMED STOPER SIZE 10 MM LENGTH 1,5 mm PERFORMED STOPER SIZE 10 MM LENGTH 2,0 mm |
| 18 | CCSI | ENGINEERING FEE, PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING |
| 19 | CCSI | ENGINEERING FEE, PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING, SEWA OTDR |
| 20 | CCSI | 1. RENTAL TOOLS AND EQUIPMENT FOR TAREMPA JOINTING 2. RENTAL TOOLS AND EQUIPMENT FOR TAREMPA TESTING |
| 21 | CCSI | 1. MAIN JOINT CLOSURE MPJC 2. AKSESORIS MPJC AND PACKING |
| 22 | CCSI | TOOLKIT SET FOR MPJC |
| 23 | CCSI | 1. SURVEY AND COORDINATION 2. RENTAL TOOLS AND EQUIPMENT (BMH RELOKASI XL) |
| 24 | CCSI | ENGINEERING FEE, PROJECT MANAGER AND PROJECT MANAGEMENT HANDLING (BMH RELOKASI XL) |
| 25 | CCSI | RENTAL TOOLS AND EQUIPMENT FOR TESTING AND JOINTING TELKOMINFRA |
| 26 | CCSI | SURVEY AND COORDINATION FOR TELKOMINFRA |
| 27 | CCSI | RENTAL TOOLS AND EQUIPMENT FOR TESTING AND JOINTING NATUNA |
| NO | CLIENT NAME | PROJECT NAME |
|---|---|---|
| 1 | PT. Communication cable systems Indonesia | Engineering and Supervised XL submarine cable transfer |
| 2 | PT. Communication cable systems Indonesia | Engineering and supervised fee BNP submarine cable transfer |
| 3 | PT. Communication cable systems Indonesia | Engineering, Jointing and testing Fiber Optic submarine cable by BNP for XL Axiata project |
| 4 | PT. Caprock communication indonesia | Power meter and light source supply |
| 5 | PT. Indo Karya Elektrik Mandiri | Supply pulling head |
| 6 | PT. Rekayasa Industri | Supply Joint closure and wire armoured clamp |
| 7 | PT. Communication cable systems Indonesia | Jasa Trainer untuk fiber Optic cable training |
| 8 | PT. Communication cable systems Indonesia | Supply Box alumunium |
| 9 | PT. Communication cable systems Indonesia | Fee Service for harris caprock In Exon mobile project cepu |
| 10 | PT. Communication cable systems Indonesia | Fee Service for harris caprock In Exon mobile project cepu |
| 11 | PT. Communication cable systems Indonesia | Fee agence kapal logindo destiny |
| 12 | PT. Caprock Communication Indonesia | Instalation fiber optic in ENI project kalimantan |
| 13 | PT. Communication cable systems Indonesia | Jasa Engineering dan Construction for Jiba CS |